Merit · Product
Working documents shared for review. Each page is republished from its source, so what you see here is the current version rather than a copy taken at some point in the past.
High-level proposal, 28 Nov 2026: what Merit proposes to deliver for SAIB Aseel offers (seven parts, by team) and the indicative timeline (go-live end of February 2027 at normal priority, end of January as top priority), with an animated flow and an interactive timeline. High level only, subject to change after deeper analysis.
Internal deck, 27 Nov 2026: what Merit builds for SAIB Aseel offers and the estimate. Level 1 the whole picture (system map, five moments, live vs new), level 2 the seven platforms, level 3 each feature screen by screen from the demo, then the estimate: standard 12 weeks with 6.75 FTE, fast-track 8 weeks with 10.5 FTE, effort by feature and role, timeline, assumptions.
Access profiles, 26 Nov 2026: default tool access per role (view, edit, admin per environment) for the E-Commerce Solution, Seller Portal and B2C Super App, for the Mohammad Ali access review. Product Manager levels final; engineering levels suggested, Ahmad Wshah confirms.
Interactive proposal, v2, 26 Nov 2026: where FX, hold and settlement live for Rewards Portal payouts. Interim decided 26 Nov: payouts take the rate from Fixer directly in the Rewards Portal (Fixer-direct interim). Target: the Rewards Portal gets an Exchange Hub quote, OMS stores the quote id and Payment charges without converting. Proposed OMS-routed outcome: Fulfillment reports to OMS only, and OMS sends capture or release to Payment (the question from Tamer, open decision 7). Animated walkthrough of one 100 EUR payout from an AED wallet, eight failure replays, swimlane and sequence diagrams, the OMS to Payment contract, ten decisions and next steps (W1-1718).
Scope tree, 20 Nov 2026: the 39 open Rewards Portal Go-Live Requirements issues (World 1) plus 3 delivery tickets, grouped into redemption tracking (MGC integration), MGC-OMS order operations, catalog and pricing, the payouts shared-services build, and the 3 payout decisions sitting with Habeeb. Per-issue detail pulled from Linear. Asks Wshah, Habeeb and Fayez to confirm owners, estimates and dates.
Deck, 18 Nov 2026, for Julie: debrief of the meeting with the TADA founder. TADA today, the founder (said vs Brian's read), fit and risks.
Clickable concept, 18 Nov 2026, for the Aramco employee offers pre-RFP technical call. Shows how offers look, how each redemption becomes SAR saved (in store by outlet scan plus bill amount, online by merchant report, exact for vouchers bought in app, shared codes not counted), the employee Savings Wallet with a calculation receipt per saving, and the Aramco HR view summed across employees. A side panel on each screen shows the rule and the data recorded. Two open decisions marked on screen. Sample offers and numbers. Space plays, arrows step, 1 to 5 jump.
Client-facing explainer for Aramco, 24 Nov 2026: employee savings counted from offer code reveals in the app. Flow diagram, why reveals (the purchase happens on the merchant site), one saving value per offer from its terms, counting rules, sample design of three employee screens and the Aramco HR monthly view, and five open questions. Concept with sample numbers.
Visual roadmap, version 1.9, 26 Nov 2026: Merit product plan from November 2026 to December 2027. A swim-lane grid by product and quarter with a 2027 calendar, the three E-Commerce growth waves and their goals, the Merit App promises and the Al Fursan Standalone App timeline, the capacity ask and the decisions needed.
What is left, 18 Nov 2026, updated 24 Nov with Khawar's answers on the Merit App to-do list. Three tabs: Merit App and E-commerce rows still open for Khawar, with the Linear description copied in (he has no Linear access), and the QA rows for Fuad and Mohammed.
Clean-up list for Khawar, 12 Nov 2026: open Linear tickets for the Merit App (B2C, with Khawar's 11 Nov comments) and E-commerce on two tabs, grouped by status. Khawar updates each ticket in Linear.
Status check, 10 Nov 2026: 224 Merit App (B2C Super App) work items from Jira MBA and the matching Linear tickets, grouped by status, with a question per row so Khawar can mark each one done or not done in comments.
Explainer with a clickable sample, 9 Nov 2026: how PIM categories, category collections, standard collections and tags differ, how they build the storefront menu, how to structure a store, and the open points. The admin portal and the storefront run side by side, with 7 guided scenarios in English and Arabic.
Client approval page, 13 Nov 2026: five real UAT storefront screens for Al Fursan estimated delivery dates (physical checkout as live today, gift card checkout, order placed, a late order in My Orders and in order details), new parts marked, the exact wording, and an Approve or Request a change button per screen for Saudia.
Clickable prototype, 5 Nov 2026: the cut Al Fursan migration scope as real screens in the Merit design (Figma tokens), web and mobile web, English and Arabic. Storefront, Storefront Admin, Seller Portal and LiveOps, 25 screens, every feature pinned to its AFM row and Linear ticket with requirements, plus a feature index (52 of 54 kept rows on a screen, 6 with no ticket yet).
Interactive tree, 4 Nov 2026: Merit App (Merit ID) scope for the internal launch to Merit employees in KSA by 30 Nov and the end-of-December demo. Keep, gaps with no ticket, Brian calls and deferred roadmap items, with MBA board status. Counterpart of the Al Fursan scope tree.
Interactive tree, 3 Nov 2026: the cut Al Fursan migration scope by initiative, 72 AFM tickets with requirements, business rules and acceptance criteria where written, Jira and Linear links (10 of 72 in Linear W1), dark mode.
Explainer, 12 Nov 2026: plan to move WAIT, COM and DEC to one shared Merit store with Thino. One obligation record replaces the COM and WAIT pair, writes land with checks and flags instead of a review gate, ten discrepancy types with their rules, a 3-phase rollout, what changed since the 1 Nov ASB Hub plan, and four decisions.
Explainer, 1 Nov 2026: keep rules in company GitHub with PR review, move records (decisions, commitments, waiting-ons, work tree, artifacts, comments) to a Docker-deployed ASB Hub server, agents only propose and a named person confirms. 6 diagrams, a 5-phase plan and three decisions: where it runs, the Ledger Sheet, code ownership.
Clickable demo, 30 Oct 2026: a real Merit Confluence page (PRD - SMS Service provider selection) with its draw.io diagram, imported through the API into Outline, the diagram edited and saved, and an AI agent answering from the page over MCP.
Deck, 30 Oct 2026: move the new world from Confluence to a self-hosted Outline wiki. Backup in three copies, API import with no Word export, draw.io diagrams kept editable, 7-week timeline 2 Nov to 18 Dec, owners, risks and three decisions.
Visual explainer, 30 Oct 2026, of the Endeavor Access to Market Tour in Indonesia: the ecosystem model, leads map, B2B vs B2C options A to E, the 90-day pilot, risks and three decisions for Fred.
Deck, 28 Oct 2026: Yousef Alkhrissat open questions on AFM tickets, MSP-601 and MSP-566. One slide per ticket: what it is, the question, what is already decided, the proposed answer, and the call Brian needs to make.
Deck, updated 27 Nov 2026: restart update first (where the 27 Oct meeting stopped, the questions still open, the Finance agreement of 17 Nov, how rate changes arrive, the 1 Dec sprint scope and the asks), then the 27 Oct roadmap as appendix: Online Catalogue automation on the master plan five phases. Phase status, the build order (3b, then 3b guard and 4a, then 2a, 2b and 4d, then 4c), the requirement map, how an approved rate reaches client prices, the two client models, fixed-discount rules D1 to D6, open items, risks and asks.
Explainer and clickable journey, 27 Oct 2026: how new-hire onboarding works once automated, from adding an entity and drafting the offer to document upload, reminders, joining and probation confirmation. Swimlane diagram, hire record states, proposed build and an hours-saved estimate.
Animated deck, 26 Oct 2026: roles and permissions in the Seller Portal. Two role spaces (Merit staff, seller org) on one Identity Service, the Full/View/None matrix, enforcement at the API, token memberships, invite lifecycle, Super Admin, and the AFM-26 decisions.
Slide, 26 Oct 2026: the Al Fursan seller migration approach on a timeline. Two seller rules, six phases from align to legacy off with gates and owners, where the API connection happens, the 28 Oct session with Akshay team and what stays open.
Deck for SAB, 21 Oct 2026: SAB PayWear powered by Merit ID. One customer day with a payment ring: getting the ring, coffee reward, points to miles at the airport, Priority hotel perks, Family Pay for a child, who does what, a 90-day pilot and five joint decisions.
Explainer, 21 Oct 2026: is SAB PayWear powered by Merit ID possible? Verdict and three conditions, the three layers, one tap step by step, enrolment, the data line Merit never crosses, a check of each proposal claim, the 90-day PoC and questions for SAB.
Deck, 27 Oct 2026: E-com Solution weekly business review 3 with Rufus. Top 3 callouts, scoreboard and signup funnel (160,242 clicks to 3 accounts), Meta lead form numbers, Meta findings M1 to M6 and fixes F1 to F8 with owners, signup verification findings and actions A1 to A11, data integration status, homework and limits.
Deck, 20 Oct 2026: E-com Solution weekly business review with Rufus. Top line first (USD 160K a month from 16 tenants, scoreboard, working back to weekly meeting targets), homework still open from 13 Oct, data connection status as agreed with Fred, demo video questions, eight actions with owners.
Deck, 19 Oct 2026: Marketplace sprint backlog review. Six complaint problems on the Al Fursan store (late orders, selling stock we do not have, gift card code wait, login and miles, redeem help, miles refunds), what the data shows, what we investigate, the fix plan per Engineering, Operations, Partnerships and Finance, ticket mapping, timeline and owners.
Deck, 15 Oct 2026: moving Merit from the Tintash Jira boards to Linear without losing a ticket. One team per World, what a plain import loses, archive then import then verify, Tintash two-way sync until 30 Nov, timeline with owners, 33 people per World, blockers, feedback ask by Mon 19 Oct.
Report, 15 Oct 2026: Seller Portal fulfilment time per supplier, split into supplier accepts, supplier prepares and carrier delivers, plus door to door and the open backlog. Median, 90th percentile and order count per cell, with the SQL behind each stage. For Thino and Palak to confirm.
Deck, 15 Oct 2026: weekly F-Team update for 9 to 15 October. Al Fursan migration direction, three plans written, Drop 4 rules, Marketplace delivery, STC phase 1, owners for payment and Settlement services, E-Com go-to-market with Rufus, next week.
Deck, 5 Nov 2026: weekly F-Team alignment update for 29 October to 5 November.
Deck, 12 Nov 2026: weekly F-Team alignment update for 5 to 12 November. Year-end e-commerce scope, Merit ID staging and 30 Nov path, Rewards Portal specs risk, Al Fursan, support and fraud, Linear, last week's promises, asks.
Deck, 23 Nov 2026: BiWeekly core product progress for Fred. Merit App pilot Wed 25 Nov, Rewards Portal payouts design and owner gaps after 30 Nov, Tintash handover, Seller Portal, risks, asks per person.
Deck, 12 Oct 2026: Coming Soon and Pre-Order for the AlFursan Store. Problem, three product states, member journey, member protections, decisions needed from Al Fursan, timeline to the end of November release.
Clickable mockup, 12 Oct 2026: AlFursan Store member screens for Coming Soon, Pre-Order, cancellation and refund, and Sold Out. Presenter controls for live demo and recording.
Deck, 13 Oct 2026: Online Catalogue financial automation, fixed client discount. Seven worked examples on a SAR 100 card (rate up, rate down, rate below the fixed discount, supplier switch, late approval, dedicated-supplier clone, 30-day notice) and six decisions D1 to D6 with recommendations, answer by 22 Oct 17:00 GST.
Explainer, 12 Oct 2026: Online Catalogue build, relabelled 27 Oct to the master plan phases. Animated approval-gate flow, four build steps from 13 Oct to 7 Dec, KSA go-live, decisions T1 to T3 for the tech team, open Finance items. Companion to the Phase 1 Implementation Plan v0.1.
Explainer video, 12 Oct 2026, 62 s with English voice-over: what Online Catalogue Financial Automation Phase 1 builds, in four increments, and the three asks for the tech team. Companion to the Phase 1 explainer page.
Explainer, 8 Oct 2026: how Omniful sellers, products, stock and price come onto Merit through one new connector that reuses the Seller Portal External API, PIM and the Supplier Order API. Three flows, what Merit asks Omniful for, four phases, open questions.
Partner-facing proposal, 12 Oct 2026: how Omniful sellers sell on Merit through one connection. Three flows (catalog, stock and price, orders), proposed targets, the API specification Merit needs from Omniful, four phases, and the agenda for the specification call.
Partner-safe slide deck, 26 Oct 2026: the goal, the three flows, how Merit builds the connector, the six API items Merit needs from Omniful, four phases, open questions and next actions with owners.
Partner-facing video, 12 Oct 2026, with English voice-over: how Omniful sellers sell on Merit through one connection, the three flows, and what Merit needs from Omniful. Companion to the proposal page.
Partner-facing explainer video, 12 Oct 2026, with voice-over: how Omniful sellers sell on Merit through one connection, the three flows, what Merit needs from Omniful, and the phases.
Proposal, 7 Oct 2026: how Merit handles partial refunds when one supplier cancels one item of a multi-item order. End goal, six OMS rules, a worked split calculator, four phases, and the Phase 1 workflow that needs only OMS work.
Deck, 27 Oct 2026: the final partial refund plan from the 26 Oct call. One payment per item for gift card orders, Miles per item for physical orders, one item per order for DPR tenants, who builds what, and the open questions.
Technical deck, 9 Oct 2026: how Merit ID holds references and payment-method tokens (never value), how checkout suggests the best points and card mix using promos and benefits, the pay order (authorise, burn, capture), failure states, and eight decisions to approve.
Explainer video, 9 Oct 2026, 82 s with English voice-over: Merit ID holds references and never value, the E-Commerce Solution suggests the best points and card mix, Mixed Payment executes it. Companion to the Merit ID pay mix technical deck.
Clickable demo, 7 Oct 2026: STC Qitaf points to airline miles via Merit Point Exchange. STC shares only the member ID; the customer enters their name once and Merit stores it under their Merit ID. First exchange, returning customer, name mismatch, and behind-the-scenes flows.
AlFursan Store revamp workshop deck, 14 Oct 2026: agenda, July recap, benchmark of KrisShop, Qantas and Flying Blue, ContentSquare findings, the new design tied to the benchmark, Drop 4 availability features, proposals beyond Drop 4, and questions for Saudia.
Marketplace monthly product review, 6 Oct 2026: YTD sales for 4 of 10 marketplaces, Al Fursan and Apple Store Jul to Sep, fulfilment risk, cancellations, customer care, the SLA gap, roadmap, seller portal, tickets, and five decisions for the room.
Marketplace monthly product review, 3 Nov 2026: status of the 19 actions from 6 Oct, cancellations, customer care rate and fixes, slow suppliers, SLA and prepayment decisions, STC, Salasa, Omniful, roadmap, payouts, and the asks for the room.
Clickable concept demo of the PIF employee rewards journey on Merit mobile web: SMS invite with auto-filled OTP, the PIF membership with missions and activity, redeeming an offer from a PIF company, buying a digital gift card and merchandise with points, inviting family inside a PIF ceiling, and the PIF rewards admin on desktop. Guided path plays the standard journey; everything is clickable. Illustrative data.
Three sliders for the September 2026 investor presentation, in Fred's order, plus the roadmap as a separate slide. Slider 1: loyalty value trapped behind identity, the one verified Loyalty Passport that answers it, four tiers from Starter to Enterprise with the reason each one buys, the AI core (mTrust behavioural scoring to GA in October, best-method routing at checkout, and the cross-programme data moat), and the differentiator that no competitor holds verified identity, KYC reuse and trust scoring together. Slider 2: markets, the B2C persona, the five issuer types in the B2B ICP, the partners already connected, and the live pipeline. Slider 3: the 2027 revenue model by driver, with revenue YTD and planned 2026 left as Finance gaps rather than estimated.
Three sliders, with the roadmap inside slider 3. Slider 1 frames the product as one loop rather than a wallet: earning is locked to one brand so balances stay small and expire, and spending needs the issuer's own store at the issuer's own rate. Merit opens both halves, and the AI core carries the checkout agent that finds value across programmes plus the coach that surfaces one thing to do on the earn side. Slider 2 is the four Year-1 markets with their GMV split, the personas, the priority issuers per market and the three growth paths. Slider 3 stays on the Year-1 target rather than a monthly run-rate, states plainly that there is no public user base yet, and carries the roadmap.
The product Merit sells, not a migration. A white-label, multi-tenant, loyalty-native commerce engine: a bank, telco or airline launches its own branded marketplace on Merit's supply chain and loyalty infrastructure without building a commerce stack. Slider 1 puts the pain on the buyer's side of the table, one row per person who feels it, from the head of loyalty who cannot run logistics to the member forced to pay all points or all cash. Then the four tiers with their subscription and both take rates, the matrix against generic commerce and loyalty engines, and the AI core led by Arabic search as a launch-critical capability. Slider 2 is the clients already trading and the named targets per market. Slider 3 is the tenant ramp to $869.2K a month, what that annualises to, and the roadmap.
How the products actually connect, drawn rather than listed. The four-sided network from the approved Merit ID artifact, with identity sources and issuers feeding in on the left, Merit surfaces and merchants drawing out on the right, and Merit ID in the middle holding none of the value itself. Then the five layers with an owner against each one, including the value graph that the issuer keeps, which is the reason an issuer joins at all. Closes on the five step loop and why it compounds: three issuers make three connections, five make ten, eight make twenty-eight, so settlement scales with the connections between customers rather than with the count of them.
Three demos Fred can run without a product person present, four minutes each, with the exact line to say at every step. Demo 1 leads with the live Al Fursan marketplace, where the miles and cash slider is in production today under MP-7605 across around 1,500 SKUs. Demo 2 is the B2C Super App on Android, with the pre-flight checklist and the recording fallback. Demo 3 is the E-Commerce platform, and it names the constraint plainly: it has to run on a prepared environment with a seeded tenant and cannot be created live in the room. Ends with the seven open items and their owners, three of which are Finance.
Everything the Al Fursan migration team needs on STC, per 11 September 2026. Why STC is a gap to build rather than data to migrate, the four properties of STC's stock model that cause every complication downstream, the six API calls with their required fields, the single delivery address shape and the six problems it deletes, the nine step customer journey with the two deliberately manual steps, the verified Jira state of all eight tickets, the rewritten checkout check with its fail open rule, the four things still blocking (three of them STC's), the six items the new Seller Portal has to build and has never been sized, and the six specification documents that exist only as repo markdown.
The whole solution on one page, per 11 September 2026. The map first, read downward and drawn box to box across eleven numbered seams: the green band is what we own with Core on its own row as the single front door, the purple band is Akshay's Platform services that we call, the amber band is MGC and the Online Catalogue from the old world, and the vendors sit outside. Then the five rules that decide where a thing lives (PIM owns the product and Core owns the offer, Core is the only front door, only OMS moves an order once it exists, everything after the order is the Fulfillment Service, and we connect to a rule engine rather than keep a copy of it). One row per service saying what it owns, who it calls, who calls it, and its work-tree node. Three flows traced end to end: an order, the catalog and stock bridge, and the money. Closes with what we depend on and do not own, and what on this page goes stale first.
Two pages of text and five diagrams, written for Muneeb Meer before the technical deep dive of 12 September, so the twenty-page PRD is not the first thing he reads. What the work actually is (storage behind a LiveOps screen that already exists), the three phases and why only Phase 0 blocks anyone, who sets which commercial number and at what level, why Ecommerce Core blocks the Rewards Portal rather than the reverse, the two VAT streams the ZATCA invoice has to print, and the six open questions. Names the one contradiction in the record: the grain was settled per product on 8 September and recorded as per variant on 7 September.
v1.1, corrected after Julie Barbier's note of 9 September. Seventeen slides for the internal team, plain language, no technical detail on the slide faces. Merit ID members are Merit's own and Merit owns their data, so screening them is a product decision with no counterparty. Partner programme members are the separate case that is a partnership question. Why sellers already work, the three routes with the owned route first, and the two things the business is being asked for. Arrows or space to advance, Esc for all slides, F for fullscreen, N for speaker notes, T for light or dark.
v1.1, corrected after Julie Barbier's note of 9 September. Merit ID is Merit's own product and Merit owns the data in it, so the blocker there is scope of collection, not data rights. Partner programme members are the separate case where data rights do bind. Which LSEG World-Check product fits, the three routes to the data with the owned route first, and where the work belongs on the roadmap. Answers angle 1 and angle 2 of Julie's LEAP note. Section 7 maps the five counterparty touch points and the two that are unguarded.
Clickable walkthrough of the promo code MVP agreed on the 2 September reset call. Simulates a real session: the merchant onboards through the invite link, pins the outlet on Google Maps and creates a promo code, then the customer picks the offer, reads the code to the cashier and confirms it. Every action plays and stops on its own. Since 14 September it also carries the SSO handoff, with SAIB's outstanding half stated on the screen, and a full Arabic right to left build behind the toggle in the header. Space plays, arrows step, shift with arrows changes screen.
The customer side only, built for SAIB to walk SAMA through it. Starts at sign in to the SAIB app and opens Aseel offers already signed in, then splits into two journeys. In store (offline): find an in-store offer, read the terms, tap Show my code, the cashier applies the partner-issued code at the till, confirm it was used. Online: find an online offer, show and copy the code, enter it at checkout on the partner website or app, mark it as used. No merchant or technical steps. Full Arabic right to left build behind the toggle. Space plays, arrows step, shift with arrows changes screen, 1 to 5 jump.
Generic promo code versus a unique code per customer, for Aseel offers. Merchant journey and customer journey side by side, built on the wireframe SAIB accepted, with a switch between the two code models and a warning at every step where they differ. Ends with the decisions Merit needs and the document changes.
Clickable prototype, 5 Nov 2026: how a merchant registers for Aseel offers on its own, from the invite link to a live offer. 15 screens, four flows (in-store cafe, online shop, large chain with POS integration hand-off, failure paths), English and Arabic, with the open points marked on the screens. Built for team feedback on the flow.
A working prototype of the Merit ID app, five journeys each shown end to end: earn with a survey, get a discount, get cashback, use a member benefit, and buy online. Built to be screen recorded for the VISA demo video. Press 1 to 5 to pick a flow, M for the menu, H hides the presenter bar.
Monthly office hours deck, 2 Nov 2026: what changed since 5 Oct on both products, the rules decided, work in progress with owners and dates, blockers, open questions and the dates to the next office hour.
Weekly product-marketing deck, 3 Nov 2026: October spend up 352% while finished accounts stayed at 3. Funnel from visitors to accounts, cost per account, the verification and audience leaks, lead follow-up, and the actions to agree.
Three decks in one presenter: the E-Commerce Solution, the B2C Super App and Merit ID. Each opens with the pitch, then the working detail. Arrow keys or the edges to move, Index for all 50 slides, n for speaker notes.
Diagram-first engineering onboarding map: the twelve seams between the Marketplace and Platform stacks, six process diagrams, the Old vs New feature parity matrix, and the decisions it forces. For engineers joining Merit commerce.
Why we cannot list the build yet, the three discovery lenses, the phase plan with dates, and a dated go/no-go on the October cutover. For Fred, Aditya, Akshay, Muneeb, Marthino and Ops.
How a digital gift card reaches the catalogue, how a discount is set for one product and one tenant, and what happens to the money between the order and the settlement report. Two swimlanes, the setup flow, twelve gaps and eight open questions. For Marthino and Habeeb.
What PIM owns, the category-to-variant data model, how a product gets in, the collision rule, and every PIM feature with its rules, services and spec.
The order state service: what it owns, the twelve states from the code, item roll-up, Seller Portal mapping, cancel and refund, where PRD and code differ, and every feature.
The client store and the Storefront Admin Portal: three surfaces, how a product reaches the store, checkout, roles, and every portal and store feature.
The commerce backbone: Old World vs New World, Product vs Offer, Buy Box, order lifecycle.
The consumer side: the points wallet, earn and burn, paying with points, the four markets.
The supply side: how sellers list, price and fulfil, screen by screen for each user.
Is this uploaded product already in the catalogue? Why a high score is not enough, shadow mode, and the region trap.
Market as a first-class entity, why Tier 1 needs no multi-currency at all, and the six phases to size.
What happens when STC has no stock in the buyer city, the scenario simulator, and five ways to fix the rejection experience.
The concept behind MSP-392 and DEC-0172, in diagrams. What makes an attribute an axis, how axis values multiply into SKUs, the cap of five per category, who may create one, and the iPad WiFi case shown before and after.
The requirement behind MSP-392. What makes a Variant distinct, the four paths through Product Upload, and what happens when two real items collide on the same axis values. Requirements B, C, D and G with acceptance criteria.
One PDP for the UAE, International and US phone. The live version selector, why the axis route beats display grouping, and the five things engineering has to confirm.
Answers to the technical and commercial clarification list, 14 points.
The commercial proposal, five open business decisions and the phase map.
Who scans what, and what changed on 5 August 2026. The customer scans the outlet QR on their own phone and the store scans nothing. Built for the SAIB compliance re-check.
The recommended in-store journey, screen by screen on the shipped Aseel design. STALE: still shows the cashier handover removed on 5 Aug 2026.
Why SAIB is accepting a downgrade, and the six ways back. QRIS and Grab Dine Out as the mental models, five journeys animated end to end, and the two questions that decide it.
How a rate change, an order and a redemption differ, and which phase owns each step.
The five phases, what each delivers, and where the accounting integration attaches.
The week point by point, then the whole portfolio as one explorable tree, with what moved in the reporting week.
Real screenshots and a walkthrough of the actual Linear product, for the JIRA/Linear decision.
The identity layer under everything: why loyalty fails, the architecture rule, the issuer network, the checkout agent.
How an order becomes a parcel: the routing rule, what is built on the board, and where that sits against the Q3 plan.
The two decks for the Amman on-site: B2C Super App in six slides, then the E-Commerce Solution in fifteen. That deck maps the six things inside the E-Commerce Solution, then gives each one a slide: Seller Portal, Storefront, Storefront Builder, E-Commerce Core and PIM, Fulfilment Service, OMS. Diagrams, the tenant ramp, and real product journeys screen by screen.
The same two Amman decks, one slide on screen at a time. Arrow keys or the edges to move, Index for the grid of all 23 surfaces, n for speaker notes, f for fullscreen. Use this one in the room; the review page above is for reading.
What happens to an order that has not finished by day 30: the release condition that cannot be evaluated without a delivery event, the five proposed rules, and what Partnership and Operations each have to do before the 21 August sign-off.
Fayez's 16 tests all pass, and twelve further probes found five defects. The three blockers are one problem: a code matched by nothing but itself, no rate limit on guesses, and a 65,536 code space. With the attack arithmetic and what has to be decided before Tintash starts.
The store has one door today, the rotating "Shop with Miles" card in the Exclusive offers carousel on Home, so it disappears when the campaign does. Two placements, drawn before and after over the live Saudia app screens: a "Shop with Miles" row second in the AlFursan tab Miles list, and an "AlFursan Store" row with the external marker in the side menu after Miles Calculator. Both are one list row. No fifth bottom tab is being asked for.
How Merit's fulfillment works today through OTO, what phase 1 of the proposed Omniful integration actually moves (Merit's seller and product data outward, one way, no return channel), how that inverts the synergy the two companies aligned on back in August, and the gap in a possible phase 2: Omniful has no product-upload path for its own sellers today.
The plan for the next PIF demo: Merit as the engine PIF runs its programmes on, scene by scene in presenting order, what each scene shows and why, today's demo next to the new one, and what is real today versus labelled "coming" in the prototype.
The full PIF session in one file, scenes 0 to 7: opening slides, the clickable demo of Super Platform, LMS programme setup, Ceer onboarding in the Seller Portal, the employee app, recognition slides, revenue through Al Fursan and the Seller Portal, then phases and close. Arabic and English.
Clickable presenter mockup of the ASB phone app, continuation scope only: home with the active session and composer above the fold, chat with auto-follow pause and jump pill, tappable links and text copy, provider switch from the chat header, permission and question cards, and the phone recording upload states through to "Recorded on phone" in the desktop Meetings list. Keys 1-5 pick a flow, arrows step, M menu, H hides the HUD.
ASB desktop redesign, round 2: Settings and Dashboard organised by user goal, Outputs side panel, About with changelog, two-pane Tree explorer, list and detail on every Dashboard tab including Usage, first-week and heavy data sets. Arrows step, number keys jump, H hides chrome.
ASB desktop redesign, final round with the four approved decisions: Follow-ups folded into Work, Meetings has one home, Outputs opens on This chat, cost only in the status bar and Usage. Goal-based Settings, two-pane Tree, list and detail on every Dashboard tab.
ASB desktop redesign, round 4: left sidebar back (workspace switcher, grouped session list with search, status marks and row menu) and a Productivity tab (measured hours, leverage, estimated hours saved with editable assumptions, trends, breakdowns, share card).
ASB desktop redesign, round 5: footer quick toggles for agent, provider, model, effort and mode; running/unread chip removed; phone recordings in Meetings; productivity decisions final.
Explainer deck for the PRD Pricing and Tax Model: one price basis, two VAT streams, market display mode, worked example 200.00 to 268.80, who gets what, team changes and rollout.
Talk orb: jelly. The gooey metaball orb redesigned as soft jelly, where each state is a shape and a motion (droplets fusing, open bowl, kneading lobes, flung droplets, tight bean, puddle) and colour drifts at random. At 240px and as the 24 to 32px busy loader. Keys 1-6 states, A auto-cycle, M moons, G greyscale, V simulated voice.
Decision deck, 13 Oct 2026: what the Seller Portal form should show for VAT until seller VAT status is stored (MSP-602). What the form shows, bulk upload scope, why the status is missing, two options, limits.
Deck, 19 Oct 2026: how Al Fursan API sellers move to the Ecommerce Solution. Existing sellers keep legacy until the new storefront takes traffic, new sellers start on the new world fed to legacy. Six phases, gates, risks, deep-dive questions and the 19 Oct action items.
Explainer deck, 14 Oct 2026: Al Fursan Old World to New World migration after Fred's review. Fred's frame, the capacity gap, the Ramadan deadline, three plans compared, Plan A workstreams, canary rollout, timeline, keep-or-leave scope and four decisions.
Draft of 28 Oct 2026, the current working plan: 117 tickets sorted into P0, P1, Delay, No dev effort and Obsolete, about 187 must-have dev-days, build to mid-January, switch in the first week of February 2027.
Deck, 15 Oct 2026: Saudia's priority table from the 14 Oct revamp workshop, ten plans from requirement to publish by 10 Dec, gates, timeline, capacity and decisions.
Deck v2.1, 16 Oct 2026, Merit internal: Q4 for fewer complaints, new features in Q1 built once. Five reasons (September Apple Store launch, care cases, items blocked outside Merit, 297 developer-day plan, Ramadan and the Tintash exit), what Q4 delivers instead, the cut, open decisions.
Explainer, 26 Oct 2026, Merit internal: what Saudia asked for the Al Fursan standalone app (four topics, H1 2027), the workshop goals, the proposal deck as one solution map, Al Fursan Pay options A to C, phasing, 12 decisions, and where the proposal is ahead of what Merit runs today.
Deck, 29 Oct 2026, Merit internal: product feedback on the AlFursan App v2 proposal before the 2 Nov workshop, six fixes (decisions slide, goal-first order, live/planned/proposed labels, Pay wording, first-year ramp, 3-hour workshop plan) and four things to settle.
Interactive diagram, 29 Oct 2026, for the AlFursan workshop: what Merit runs for AlFursan today, then an animated move to the AlFursan app. Click any box to open it in place: earn, spend (Store, branded stores, gift cards, travel), pay and wallet, Merit ID connections (gateways, suppliers, banks, delivery), team tools and partners. Nine-step present mode.
Deck, 28 Oct 2026, Merit internal: 1,889 SMH tickets (1 Sep to 14 Oct) by real root cause, size per group, proposed fix per cause, October ship-date check, priority and owners to agree.
Mockup, 28 Oct 2026: before and after for six AlFursan store screens where the care fixes land (product page, checkout errors, confirmation, My Orders, inquiry gate, delay email).
Deck, 27 Oct 2026, Merit internal: AlFursan Store mobile revamp in 20 slides. Keep, change, prove board; functional hero; what the team sends per campaign; gift cards under the hero; 4:5 banners; slider with swipe and pause; search and categories; PLP, PDP, checkout and OTP; miles display; one Contentsquare KPI per change.
Deck, 29 Oct 2026, Merit internal: Brian update for the BiWeekly Core Product (13 to 29 Oct). Al Fursan canary risk, Tintash exit gaps, Saudia drops, payments and refunds, B2C, four decisions for the room, next two weeks.
Deck, Nov 2026, Merit internal: product review for Julie across the roadmap 2026-27, with the supporting review pack.
Explainer, 4 Nov 2026, Merit internal: Rana Al Sukhon scope. She owns the E-Commerce Solution (minus Seller Portal) and the Merit Super App; Brian stays in charge of the Al Fursan migration and the first build until the switch. Scope map, handover phases, who decides what, how she reports to Brian, next steps.
Guide, version 2, Nov 2026: how Brian Arfi works at Merit. AI drafts and he decides, draft first and question second, async first, hours in WIB and Amman, what he expects from his team, what they get from him, and a little about him.