Weekly F-Team Alignment

Merit Product
Weekly Update

9 to 15 October 2026  ·  Brian Arfi Faridhi, Product Director

→ next ← back Esc all slides F fullscreen N notes T theme

Status first, then the one decision, then the risks. Do not open the migration plan here; it goes to the 18:15 one-to-one.
The week in one view

The migration has a direction. Two services need an owner.

Delivered
  • Fred set the Al Fursan migration direction
  • Three plans written: migration, Drop 4, Linear
  • Drop 4 rules with Saudia
  • E-Com go-to-market reset with Rufus
Decision needed
  • Owner of the payment integration service
  • Owner of the Settlement Service
Risk on the clock
  • STC phase 1 moves to 22 October
  • Migration: about 297 developer-days, 3 developers today
One line each. Come back to the decision on slide 8.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Planning this week

Three plans are written: the migration, Drop 4 and the move to Linear

Ready for Fred · 15 Oct

Al Fursan migration

  • Silent build in parallel
  • 6 internal drops to staging
  • One switch for Saudia, through the canary
With Saudia · 15 Oct

Drop 4

  • Sold Out PRD v0.7
  • Coming Soon and Pre-Order BRD v0.8
  • Per-SKU cap goes in on 16 Oct
Import next · by 26 Oct

Jira to Linear

  • One Linear team per World
  • Squads as labels and saved views
  • World 2 and 3 board access granted
Linear Worlds: World 1 Ahmad Wshah, World 2 Fred and Tamer, World 3 Fayez Hilow.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Al Fursan migration · Fred, 14 October

Plan C is closed. End of December stays the target, in smaller drops.

0
urgent tickets in the gap list
0
done or in progress
0
developer-days estimated
Squad today: 3 developers · ceiling of 8

Fred's direction

  • 6 to 9 drops, no big bang
  • Scope can be cut if the store looks the same to Saudia
  • End of February is the hard deadline
  • Tintash leaves on 30 November
Source: Fred's migration review, 14 Oct. Progress check with Fred at the end of October.
The 297 days come from the 14 Oct gap list. The capacity plan goes to Fred at the end-of-October check-in.
Al Fursan migration · the plan

Build silently, ship 6 internal drops, switch Saudia once

Silent build
New platform in parallel
Drop 1
to staging
Drop 2
Drop 3
Drop 4
Drop 5
Drop 6
every two weeks
One switch
Saudia, via the canary

No live drops

The old APIs need no backward compatibility, so no extra build cost.

Progress every two weeks

Each drop is tested end to end against the old store.

One scope rule

If a Saudia member or staff user would miss it in week one, it is in.

Written by Brian on 15 October for Fred's review. Dates and the hiring ask go to the 18:15 one-to-one, not this room.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Marketplace · Saudia Drop 4

Drop 4 rules are with Saudia. The build waits on their change request.

MODE 1

Sold Out

The product stays visible at zero stock. Off by default.

MODE 2

Coming Soon

Launch products with Notify me. Operations turns it on.

MODE 3

Pre-Order

Miles only, or 2,000 miles plus card. Auto refund after 28 days.

Done

Engineering walkthrough on 13 Oct. BRD v0.8 sent to Saudia on 15 Oct.

Open

Switch per product or per variant. Raneem's cap per SKU goes into the Sold Out PRD on 16 Oct.

Saudia must approve the cart messages in English and Arabic before UAT. Wael and Heba agreed the rules.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Platform · STC Apple supply

STC phase 1 moves to 22 October, after a test pack on 18 October

16 Oct
Old release date
18 Oct
Test pack to STC
After the pack
STC releases production credentials
22 Oct
Phase 1 release
Blocker

Sarika must confirm STC's exact conditions.

Live

Giftomatic is in production (13 Oct).

Slipping or blocked

Nielsen SMS 3 to 4 days late. PayPal testing blocked until funds arrive.

Test pack: screenshots, logs and test cases from the UAT happy path.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Decision required

Two new-platform services need a confirmed owner

Owner to confirm

Payment integration service

Does

Card and points payments, refunds, tax

Waiting

The partial refund API

Options

Marthino's team or Tamer Labna's team. Tamer said his team on 13 Oct

No team today

Settlement Service

Does

The final money calculation per order

Waiting

Migration invoicing and gift card settlement

Status

Never planned. PRD v0.4 is ready

The ask: one name for each, today.

The group is the decider, so it needs one voice to close.
Merit Product · Weekly Update · 9 to 15 Oct 2026
E-Commerce Solution · with Rufus Giwa, 13 October

Go-to-market is reset to large tenants, on profit share, sold by sales

$0k / month
revenue goal, from 16 large tenants
0
qualified leads from the new manual process

Why: self-serve sign-up did not convert

Super Platform sign-up funnel, people per step

Tried a personal email (blocked)
286
Used a work email
24
Verified
2
Completed onboarding
1
Next: Brian sets up the weekly business review and a short demo video. Rufus sends the remaining data sources and channel targets.
Model moves from subscription to profit share (Saudia example: 30%). The seller target is dropped. Onboarding is not locked behind a demo.
By team

Most capacity is on the migration this week

Marketplace

  • Sprint 126 closed at 46 of 78
  • Drop 4 rules with Saudia
  • Revamp workshop held, 14 Oct

Platform

  • Sprint 76 at 9 of 51
  • Gift card API on staging
  • Catalogue discount needs Finance

B2C Super App

  • Capacity is on the migration
  • No new delivery this week

E-Com Solution

  • Migration plan written
  • Partial refunds: pro-rata agreed
  • Miles adapter PRD is late

Cross-team

Jira to Linear: plan written, import end to end by 26 Oct.

People and hiring

Interview meetings confirmed for the next 4 days.

Saudia paused OTP Phase 2 and Promo Code; eSIM is out of Q4.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Next week

Next week: the migration plan, the STC test pack and Drop 4 come first

P0

Migration plan: drops and an estimate for Fred's end-of-October check-in

P0

STC phase 1: test pack 18 Oct, release 22 Oct

P0

Drop 4: Sold Out PRD with per-SKU cap 16 Oct, then Saudia's review

P0

Miles burn adapter: PRD and gateway contract to Habeeb Rahman

P1

Julie's October targets: fulfilment time per supplier

P1

Omniful: API specification call, spec sent first

P1

Jira to Linear: end to end by 26 Oct