Weekly F-Team Alignment
Merit Product
Weekly Update
9 to 15 October 2026 · Brian Arfi Faridhi, Product Director
→ next ← back Esc all slides F fullscreen N notes T theme
Status first, then the one decision, then the risks. Do not open the migration plan here; it goes to the 18:15 one-to-one.
The week in one view
The migration has a direction. Two services need an owner.
Delivered
- Fred set the Al Fursan migration direction
- Three plans written: migration, Drop 4, Linear
- Drop 4 rules with Saudia
- E-Com go-to-market reset with Rufus
Decision needed
- Owner of the payment integration service
- Owner of the Settlement Service
Risk on the clock
- STC phase 1 moves to 22 October
- Migration: about 297 developer-days, 3 developers today
One line each. Come back to the decision on slide 8.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Planning this week
Three plans are written: the migration, Drop 4 and the move to Linear
Ready for Fred · 15 Oct
Al Fursan migration
- Silent build in parallel
- 6 internal drops to staging
- One switch for Saudia, through the canary
With Saudia · 15 Oct
Drop 4
- Sold Out PRD v0.7
- Coming Soon and Pre-Order BRD v0.8
- Per-SKU cap goes in on 16 Oct
Import next · by 26 Oct
Jira to Linear
- One Linear team per World
- Squads as labels and saved views
- World 2 and 3 board access granted
Linear Worlds: World 1 Ahmad Wshah, World 2 Fred and Tamer, World 3 Fayez Hilow.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Al Fursan migration · Fred, 14 October
Plan C is closed. End of December stays the target, in smaller drops.
0
urgent tickets in the gap list
0
developer-days estimated
Squad today: 3 developers · ceiling of 8
Fred's direction
- 6 to 9 drops, no big bang
- Scope can be cut if the store looks the same to Saudia
- End of February is the hard deadline
- Tintash leaves on 30 November
Source: Fred's migration review, 14 Oct. Progress check with Fred at the end of October.
The 297 days come from the 14 Oct gap list. The capacity plan goes to Fred at the end-of-October check-in.
Al Fursan migration · the plan
Build silently, ship 6 internal drops, switch Saudia once
Silent build
New platform in parallel
One switch
Saudia, via the canary
No live drops
The old APIs need no backward compatibility, so no extra build cost.
Progress every two weeks
Each drop is tested end to end against the old store.
One scope rule
If a Saudia member or staff user would miss it in week one, it is in.
Written by Brian on 15 October for Fred's review. Dates and the hiring ask go to the 18:15 one-to-one, not this room.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Marketplace · Saudia Drop 4
Drop 4 rules are with Saudia. The build waits on their change request.
MODE 1
Sold Out
The product stays visible at zero stock. Off by default.
MODE 2
Coming Soon
Launch products with Notify me. Operations turns it on.
MODE 3
Pre-Order
Miles only, or 2,000 miles plus card. Auto refund after 28 days.
Done
Engineering walkthrough on 13 Oct. BRD v0.8 sent to Saudia on 15 Oct.
Open
Switch per product or per variant. Raneem's cap per SKU goes into the Sold Out PRD on 16 Oct.
Saudia must approve the cart messages in English and Arabic before UAT. Wael and Heba agreed the rules.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Platform · STC Apple supply
STC phase 1 moves to 22 October, after a test pack on 18 October
After the pack
STC releases production credentials
BlockerSarika must confirm STC's exact conditions.
LiveGiftomatic is in production (13 Oct).
Slipping or blockedNielsen SMS 3 to 4 days late. PayPal testing blocked until funds arrive.
Test pack: screenshots, logs and test cases from the UAT happy path.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Decision required
Two new-platform services need a confirmed owner
Owner to confirm
Payment integration service
Does
Card and points payments, refunds, tax
Waiting
The partial refund API
Options
Marthino's team or Tamer Labna's team. Tamer said his team on 13 Oct
No team today
Settlement Service
Does
The final money calculation per order
Waiting
Migration invoicing and gift card settlement
Status
Never planned. PRD v0.4 is ready
The ask: one name for each, today.
The group is the decider, so it needs one voice to close.
Merit Product · Weekly Update · 9 to 15 Oct 2026
E-Commerce Solution · with Rufus Giwa, 13 October
Go-to-market is reset to large tenants, on profit share, sold by sales
$0k / month
revenue goal, from 16 large tenants
0
qualified leads from the new manual process
Why: self-serve sign-up did not convert
Super Platform sign-up funnel, people per step
Tried a personal email (blocked)
286
Used a work email
24
Verified
2
Completed onboarding
1
Next: Brian sets up the weekly business review and a short demo video. Rufus sends the remaining data sources and channel targets.
Model moves from subscription to profit share (Saudia example: 30%). The seller target is dropped. Onboarding is not locked behind a demo.
By team
Most capacity is on the migration this week
Marketplace
- Sprint 126 closed at 46 of 78
- Drop 4 rules with Saudia
- Revamp workshop held, 14 Oct
Platform
- Sprint 76 at 9 of 51
- Gift card API on staging
- Catalogue discount needs Finance
B2C Super App
- Capacity is on the migration
- No new delivery this week
E-Com Solution
- Migration plan written
- Partial refunds: pro-rata agreed
- Miles adapter PRD is late
Cross-team
Jira to Linear: plan written, import end to end by 26 Oct.
People and hiring
Interview meetings confirmed for the next 4 days.
Saudia paused OTP Phase 2 and Promo Code; eSIM is out of Q4.
Merit Product · Weekly Update · 9 to 15 Oct 2026
Next week
Next week: the migration plan, the STC test pack and Drop 4 come first
P0Migration plan: drops and an estimate for Fred's end-of-October check-in
P0STC phase 1: test pack 18 Oct, release 22 Oct
P0Drop 4: Sold Out PRD with per-SKU cap 16 Oct, then Saudia's review
P0Miles burn adapter: PRD and gateway contract to Habeeb Rahman
P1Julie's October targets: fulfilment time per supplier
P1Omniful: API specification call, spec sent first
P1Jira to Linear: end to end by 26 Oct
Merit Product · Weekly Update · 9 to 15 Oct 2026