For the World leads and product directors. Feedback by Monday 19 Oct, end of day.
Engineering work: projects, issues, cycles, the roadmap.
The conversation. One thread per project, opened by a project card.
Decisions, blockers outside engineering, and work nobody builds. Files in git, with a read-only daily Sheet.
| Board | World | Open | All issues |
|---|---|---|---|
| AFM | W1 | 344 | 345 |
| TRAV | W1 | 223 | 1,355 |
| MSP | W1 | 187 | 501 |
| MBA | W1 | 124 | 430 |
| STOR | W1 | 63 | 194 |
| ML | W2 | 163 | 409 |
| SP | W2 | 107 | 287 |
| MIM | W2 | 65 | 331 |
| RP | W3 | 99 | 612 |
of files on 133 tickets become links back to Tintash's Jira
closed tickets do not move at all
tickets lose their PR and branch links
tickets lose who was working on them (Tintash)
Once Tintash's Jira closes, those file links die and the closed tickets are out of reach.
All 4,464 issues with comments, history, PR links and every file go to Merit Drive first. The archive is the full copy.
The importer moves the open tickets. A second pass writes back what it drops: Jira key, Tintash assignee, sprint, release, PR links, Drive links for files.
Counts, comments, files, links and statuses checked per board, plus a 10-issue spot check by someone from that squad.
Each board syncs with its Linear team. Tintash stays in Jira, Merit works in Linear. Title, description, assignee, priority, status and labels cross over.
Jira goes read-only on 30 Nov, not on import day.
If the sync test on 20 Oct fails, the active Tintash devs get Linear seats until 30 Nov.
About USD 10 per person per month. Breaks the Merit-only rule, so it is a decision.
PMs, QA, designers (Raneen, Albara), Marketplace ops. Invited Wed 21 Oct.
Superplatform, LiveOps (Maria leads), Sales Incentive, DevOps (Mohammad Ali). Invited Wed 21 Oct.
Rewards, PX (Hashem leads), Habeeb. Invited Thu 29 Oct.
The full list per person is in the plan, section 5a. 9 are already in Linear. Tintash staff get no seat by default. New joiners get Linear in onboarding (Inès).
| Blocker | Who unblocks |
|---|---|
| Project admin on TRAV and RP (the importer needs it) | Hassan Yawar, Tintash |
| All 9 boards read-only on 30 Nov | Hassan Yawar, Tintash |
| How long Tintash's Jira stays readable after 30 Nov | Inès Zoubir with Tintash |
| Plan approval, team-os PR #1, Linear seats and billing | Tamer Labna |
| Fold the OPS team into World 2 as the DevOps squad | Mohammad Ali |
Comments in the Google Doc. Anything you would change in the order, the dates or the owners.
Your World's list in section 5a: who is missing, who is wrong, your squad leads. Tamer: is Ruba's AI team in World 2?
Each World lead signs off their World's import on its day. If the date does not work, say which one does.
| The plan (comment here) | docs.google.com/document/d/1ekjYGKcWhbvVZUjNwKyTxXRHUUs4AmEH1SETGR-Y5xg |
| The handbook | github.com/Merit-Incentives/team-os (PR #1) |
| The videos | "How Merit works" and "team-os", in #project-newworld-ownership |
One piece of work, one home.