Merit · Jira to Linear · draft for feedback

Moving to Linear
without losing a ticket

For the World leads and product directors. Feedback by Monday 19 Oct, end of day.

→ / Space next · ← back · Esc all slides · F full screen · N speaker notes · T light or dark
Purpose: agree the plan before setup starts on Mon 19 Oct. The full plan is in the Google Doc linked on the last slide.
The rule

Every piece of work has one home

Linear

Engineering work: projects, issues, cycles, the roadmap.

Slack thread

The conversation. One thread per project, opened by a project card.

The ledger

Decisions, blockers outside engineering, and work nobody builds. Files in git, with a read-only daily Sheet.

The handbook that defines this is team-os on Merit's GitHub (PR #1, waiting on Tamer's approval).
Structure

One Linear team per World. Squads are labels.

World 1 · Ahmad Wshah

B2C Super AppEcom SolutionsTravel Shop

World 2 · Fred / Tamer

SuperplatformLiveOpsData EngineeringPeoppl SuiteSales IncentiveDevOps

World 3 · Fayez Hilow

Giftcardsby and RewardsLMSPX
From Fred's squad sheet. DevOps folds in from the OPS team Mohammad Ali created, if he agrees.
What moves

1,375 open tickets on 9 Tintash boards

World 1World 2World 3
Table view
BoardWorldOpenAll issues
AFMW1344345
TRAVW12231,355
MSPW1187501
MBAW1124430
STORW163194
MLW2163409
SPW2107287
MIMW265331
RPW399612
Merit's own Jira (MP, MPS) is on hold and not in scope. 4,464 issues in total, so 3,089 are closed.
The risk

A plain import loses four things that matter

637 MB

of files on 133 tickets become links back to Tintash's Jira

3,089

closed tickets do not move at all

750

tickets lose their PR and branch links

577

tickets lose who was working on them (Tintash)

Once Tintash's Jira closes, those file links die and the closed tickets are out of reach.

Source: live audit of all 9 boards, 15 Oct 2026, against Linear's Jira import guide.
The fix

Archive, import, then verify every board

1 · Archive

All 4,464 issues with comments, history, PR links and every file go to Merit Drive first. The archive is the full copy.

2 · Import and fill gaps

The importer moves the open tickets. A second pass writes back what it drops: Jira key, Tintash assignee, sprint, release, PR links, Drive links for files.

3 · Verify

Counts, comments, files, links and statuses checked per board, plus a 10-issue spot check by someone from that squad.

Tintash

Tintash keeps working in Jira until 30 Nov

Default: two-way sync

Each board syncs with its Linear team. Tintash stays in Jira, Merit works in Linear. Title, description, assignee, priority, status and labels cross over.

Jira goes read-only on 30 Nov, not on import day.

Fallback: temporary seats

If the sync test on 20 Oct fails, the active Tintash devs get Linear seats until 30 Nov.

About USD 10 per person per month. Breaks the Merit-only rule, so it is a decision.

Timeline

All three Worlds moved by 2 Nov

Fri 16 OctAccess asks out, archive #1 startsBrian
Mon 19 to Wed 21Linear set up, test import and sync, go or no-goBrian · Wshah signs off
Tue 20 OctRosters confirmed per WorldWshah · Tamer · Fayez
Mon 26 OctWorld 1: AFM, MSP, STOR, MBA, TRAVWshah signs off
Wed 28 OctWorld 2: SP, ML, MIM, then the LMS split to W3Tamer signs off
Mon 2 NovWorld 3: RPFayez signs off
Thu 26 NovArchive #2Brian
Mon 30 NovSync off, all Jira boards read-onlyBrian · Hassan sets read-only
People

33 Merit people in Linear, each in their World's team

World 1 · 13

PMs, QA, designers (Raneen, Albara), Marketplace ops. Invited Wed 21 Oct.

World 2 · 12

Superplatform, LiveOps (Maria leads), Sales Incentive, DevOps (Mohammad Ali). Invited Wed 21 Oct.

World 3 · 7

Rewards, PX (Hashem leads), Habeeb. Invited Thu 29 Oct.

The full list per person is in the plan, section 5a. 9 are already in Linear. Tintash staff get no seat by default. New joiners get Linear in onboarding (Inès).

Fuad is in World 1 and World 2, so he counts in both cards. Ruba (AI team, World to confirm) and Inès (admin) make up the 33.
Blockers

Five things other people unblock

BlockerWho unblocks
Project admin on TRAV and RP (the importer needs it)Hassan Yawar, Tintash
All 9 boards read-only on 30 NovHassan Yawar, Tintash
How long Tintash's Jira stays readable after 30 NovInès Zoubir with Tintash
Plan approval, team-os PR #1, Linear seats and billingTamer Labna
Fold the OPS team into World 2 as the DevOps squadMohammad Ali
Your part

What we need from you by Monday 19 Oct, end of day

Read and comment

Comments in the Google Doc. Anything you would change in the order, the dates or the owners.

Confirm your people

Your World's list in section 5a: who is missing, who is wrong, your squad leads. Tamer: is Ruba's AI team in World 2?

Accept your sign-off

Each World lead signs off their World's import on its day. If the date does not work, say which one does.

Links

Comment in the Google Doc by Monday

The plan (comment here)docs.google.com/document/d/1ekjYGKcWhbvVZUjNwKyTxXRHUUs4AmEH1SETGR-Y5xg
The handbookgithub.com/Merit-Incentives/team-os (PR #1)
The videos"How Merit works" and "team-os", in #project-newworld-ownership

One piece of work, one home.