Al Fursan Standalone App · Merit internal · feedback on App v2 · 29 October 2026

App v2 is close. Six fixes, four of them before Monday, and only two new slides.

Product feedback from Brian for Albadarneh, Julie, Fatimah, Lamya, Inès, Tamer, Thamer, Raouf and Amit.

→ Space next ← back Esc grid F fullscreen N notes T light or dark
Open with the promise from last night: we do not rewrite the deck. Albadarneh asked us not to add too much. This feedback moves slides, changes labels and adds two slides. Brian drafts the two new slides, so the deck owner only pastes them in. Slide numbers refer to App v2 as saved on 29 Oct, 13:55 WIB, before the two new slides go in.
What to keep

Keep it: v2 already covers all four topics Saudia asked for

1. Lifestyle appSeven journeys (slides 6 to 13) and ground mode (slide 16) give members a reason to open the app between flights.
2. Al Fursan PayFour gated phases (slide 20). "Merit never holds customer money" is the right line for legal.
3. Seller PortalSlide 14 shows what is live today. It is the strongest proof point in the deck.
4. Partnership portalSlide 15 turns PX into one connection for every partner, with five clear models.
The "why now" story (Qantas, slide 4) and the vision (slide 2) are strong. Do not cut them.
Start with what works, so the team hears that this is a polish pass. The four topics come from Julie's message of 21 Oct: lifestyle app with the store, Al Fursan Pay, Seller Portal, partnership portal.
The feedback in one slide

Six fixes. The first four must be done before Monday

1. Add the decisions slide that slide 21 promisesMust · new slide
2. Put Saudia's goal first: goal, then how, then phase 1Must · reorder only
3. Label each claim: live, planned or proposedMust · labels only
4. Show Al Fursan Pay as a card and wallet path, not "on hold"Must · slide 20 text
5. Show the first-year ramp next to the SAR 18M exampleShould · new slide
6. Plan Monday as a 3-hour workshop, with the deck as the first 30 minutesShould · outside the deck
Only two new slides: the decisions slide and the ramp. Everything else is order, labels or text inside existing slides. If time is short, do 1 to 4.
Fix 1 · must

Slide 21 says "depends on the decisions on the next slide". The next slide is "Thank You"

"Timing is proposed and depends on the decisions on the next slide."App v2, slide 21, footer
Add one slide: six decisions for Saudia

Each one gets a Saudia owner and a date. Not an answer on Monday.

Brian drafts it today

Draft on the next slide. Albadarneh pastes it in as slide 22.

This is the most visible gap. Justin or Kashmira will notice it. Without this slide the deck ends on a vision and nobody leaves with an owner. The prep plan of 22 Oct set the workshop goal: scope boundaries, an MVP cut per topic, and named owners.
Fix 1 · draft slide for App v2

Six decisions we need from Al Fursan, each with an owner and a date

1. Scope of phase 1Which journeys launch first? Does the app replace the store webview, or sit next to it?
2. Card and walletLink members' own cards, or issue an Al Fursan card? Who holds the licence?
3. Miles system accessAPI access to the member and Miles system, to read, burn and return Miles.
4. Launch partnersWhich merchants and tourism partners pilot first, and who at Al Fursan signs them?
5. Data for the ROI modelActive members, earn rates and redemption cost, so slide 18 uses real numbers.
6. Owners and next checkpointOne owner per topic on each side. A date for Merit's scope and estimate.
Condensed from the 12 decisions in Brian's explainer of 26 Oct. Decision 3 is the one Merit cannot work around: Merit still needs to build the Miles read, burn and return. Premium Club pricing and the welcome bundle can wait for discovery.
Fix 2 · must · reorder, plus one line on slide 2

Goal first, then how we get there, then phase 1

This is the order Albadarneh proposed last night. Today the money story sits on slides 17 to 19, after twelve app slides.

1. The goalSlides 2, 3, 4
→
2. How Al Fursan earnsSlides 17, 19, 18
→
3. What members getSlides 5 to 13, 16
→
4. PortalsSlides 14, 15
→
5. Phase 1 and decisionsSlides 20, 21, new 22
From the call on 28 Oct (Fathom 879692982, 36:54 and 38:00): Albadarneh asked for goal, how we get there, then phase 1 detail. Brian noted that the why-now slide does not state the goal. v2 now has the vision on slide 2, so the fix is to move the business model up, not to write new content. Add one line to slide 2 with what Saudia asked for. That is four topics, an extension of the current contract, and delivery in H1 2027.
Fix 3 · must · labels only

Kashmira can read every date and "confirmed" as a commitment

SlideApp v2 saysWhat is true todayChange the label to
20P1 QR pay: "Confirmed"Merit still needs to build this."Proposed, Merit builds"
21App launch Q1 2027The same team runs the 22 Dec cutover."Proposed, confirmed after discovery"
5 to 13App screensConcept designs"Concept" tag on each screen
14Seller Portal "live today"TrueKeep
Source for rows 20 and 21: Brian's prep plan of 22 Oct. Ask Ahmad Wshah before any date stays on a slide. FansPass on slide 11 already says "proposed partner, not yet approached". That is the model for the other slides.
Fix 4 · must · slide 20 text

Pay is the one topic with a competitor. "On hold" hands it to them

What Saudia asked for

Pay with Miles at merchants, through a credit card and a wallet. Saudia already talks to other vendors about Pay (Julie, 21 Oct).

What slide 20 says

P3 tap with points: "Timing open". P4 cash wallet: "On hold". Saudia can read this as "Merit does not do card or wallet".

Proposed P3 and P4 label: "With a licensed partner, timing after the licence check". The named route (Hyperpay, Jahez) waits for Julie's call on slide 11.
The phasing itself is right: QR first needs no licence. Only the words "on hold" and "timing open" are the problem. Saudia liked that Merit works with Hyperpay, where most of the team is ex-SHARE (Julie, 21 Oct). DEC-0524, Merit's position on Pay, is still open with Julie as decider. Settle it in this call.
Fix 5 · should · new slide

SAR 18M a year assumes 500,000 active members. Year 1 builds that base

500,000members open the app each month (slide 18 assumption)
0members use the standalone app today, because it does not exist yet
Year 1is downloads, first earn and partner sign-up. Revenue follows the active base.
Add a ramp slide after slide 18

Three steps: launch, first 100,000 active members, then 500,000. Revenue at each step.

Mark slide 18 as illustrative

Real numbers come from decision 5: Al Fursan's member and Miles data.

Brian's point from last night (Fathom 879692982, 35:10): a new restaurant does not make a profit on day one; plan for a year of investment. Albadarneh agreed: people must download the app first and get value. A CLO who sees SAR 18M with no ramp will either hold us to it or not believe it. The ramp makes the number credible. Brian can draft the ramp, but the step targets need Albadarneh's and Julie's agreement.
Fix 6 · should · outside the deck

Monday is three hours with Justin. The deck fills the first 30 minutes

09:30 · The story (deck)
30 min
10:00 · App and store
45 min
10:45 · Al Fursan Pay
45 min
11:30 · Seller and partner portals
30 min
12:00 · Six decisions, owners, next date
30 min
Each topic block: show the screens, ask Saudia's open questions, agree the phase 1 cut. Then we align and present to Kashmira (Julie, 28 Oct).
Julie, 28 Oct 16:34 WIB: half-day workshop on Monday 2 Nov, 9:30 to 12:30, with Justin; Justin sends the Teams invite. Albadarneh asked for a workshop plan beyond the presentation (call, 36:05). Proposed owners for each block: app and store Brian and Albadarneh, Pay Tamer and Julie, portals Brian. Confirm in this call. Optional: if Albadarneh shares the full screen designs, Brian builds a clickable Join and Earn journey for the app block (call, 39:38).
Before we leave this call

Four things to settle today, so the deck is final by Sunday

1

Pay position. Do we take the partner route (Hyperpay) for card and wallet to Monday? Julie decides.

2

Fixes 1 to 4 in, or not. Brian sends the two draft slides tonight. Albadarneh owns the deck.

3

Who presents which block on Monday, and who runs the clock.

4

Feasibility before Monday. Who checks the Q1 2027 timing with Wshah, given the 22 Dec cutover?

End on owners, not on a recap. If the room runs out of time, settle 1 and 2 only. Prices and delivery dates stay with Julie and Fred and do not go on Monday's slides.
Sources

Five sources back every number and quote in this deck

SourceUsed for
AlFursan App v2.pptxAll slide numbers and quotes. Version saved 29 Oct 2026, 13:55 WIB.
Call, Brian and Albadarneh, 28 OctOrder of the deck, the goal slide, the first-year ramp, the workshop plan.
#alfursan-standalone-appThe four topics, the Pay competitor, Hyperpay (Julie, 21 Oct). Monday workshop time (Julie, 28 Oct).
Kickoff prep plan v0.1, 22 OctCutover capacity, workshop goals.
Kickoff explainer, 26 OctThe 12 decisions, condensed to six here.
Merit internal. Do not share with Saudia. Version 1.0, 29 Oct 2026, Brian Arfi Faridhi.